Електроенергиен системен оператор
ProfileTechnical DataDispatchingElectricity MarketEnergy LegislationInformation
Auction Results for the ATC Allocation
For the Period from 01.06.2012 to 30.06.2012
For the Period from 01.04.2012 to 30.04.2012
For the Period from 01.05.2012 to 31.05.2012
For the Period from 01.03.2012 to 31.03.2012
For the Period from 01.02.2012 to 29.02.2012
For the Period from 01.01.2012 to 31.01.2012
For the Period from 01.01.2012 to 31.12.2012
Archive 2010
Archive 2011
Archive 2009
For the Period from 14.12.2009 to 20.12.2009
For the Period from 07.12.2009 to 13.12.2009
For the Period from 07.12.2009 to 31.12.2009
For the Period from 01.12.2009 to 31.12.2009
For the Period from 09.11.2009 to 30.11.2009
For the Period from 02.11.2009 to 30.11.2009
For the Period from 01.11.2009 to 30.11.2009
For the Period from 19.10.2009 to 31.10.2009
For the Period from 01.10.2009 to 31.10.2009
For the Period from 01.09.2009 to 30.09.2009
For the Period from 01.08.2009 to 31.08.2009
For the Period from 01.07.2009 to 31.07.2009
For the Period from 01.06.2009 to 30.06.2009
For the Period from 10.05.2009 to 18.05.2009
For the Period from 01.05.2009 to 31.05.2009
For the Period from 01.04.2009 to 30.04.2009
For the Period from 01.03.2009 to 31.03.2009
For the Period from 01.02.2009 to 28.02.2009
For the Period from 26.01.2009 to 31.01.2009
For the Period from 19.01.2009 to 31.01.2009
For the Period from 11.01.2010 to 31.01.2010
For the Period from 01.01.2009 to 11.01.2009
For the Period from 01.01.2009 to 31.01.2009
For the Period from 01.01.2009 to 31.12.2009
Archive 2008

Auction Results from the Procedure for the Available Transmission Capacity Allocation

  Auction Results from the Procedure for the Available Transmission Capacity Allocation and the Commercial Transmission Rights for the Bulgarian interconnection with Greece for the period from May 10, 2009 to May 18, 2009 for the hourly intervals from 00:00h (СЕT) to 06:00h (СЕT) and from 18:00h (СЕT) to 24:00h (СЕT)
       
       
  Border: Bulgaria-Greece  
  Period: 10 May - 18 May 2009  
  Reference Number 2009BG-GR-05--10-18  
  CLEARING PRICE: 0.01 €/MW×h  
       
Participant's Name EIC CTR acquired, MW 
1 NATSIONALNA ELEKTRICHESKA KOMPANIA EAD  32X-NEK-EAD----C 210
2 EDISON TRADING SPA branch Bulgaria 11XEDISON-TRADES 10
3 ATEL BULGARIA EOOD 32XATELBULGARIAO 20
4 ENERGY SUPPLY EOOD 32XESUPPLY-BGSFK 10
    TOTAL: 250
       
    Available Transmission Capacity: 250
    NON-ALLOCATED CAPACITY: 0